Kansas City + 50 miles · Free estimates

New floors.
Zero hassle.

Whatever your floors need, we take care of everything.

Carpet•Hardwood•Laminate•LVP

Demo, haul-away and cleanup includedSatisfaction guaranteed
Setting up the room
DVA job sheetLiving room · 22 × 14 ft
Demo and haul-awayOld floor out and hauled off, subfloor checked flat
Row00 / 24
Sq ft laid0 / 308

Scroll to lay the floor

Flooring & Construction

(816) 203-6482

DVA Flooring & Construction•Kansas City, MO•Free estimates

Demo and haul-awayWe tear out the old floor and take it with us.
Cleanup includedYou get the room back swept and ready to use.
Satisfaction guaranteedIf something is off, we come back and make it right.

What we install

Whatever your floors need.

Carpet for the bedrooms, hardwood for the living room, waterproof LVP for the kitchen and basement. One crew handles all of it.

Carpet

Soft, quiet and warm underfoot. Installed over new pad and stretched tight so it stays flat.

New pad · power-stretched

Hardwood

Solid and engineered wood, nailed, glued or floating depending on the room and the subfloor.

Solid and engineered

Laminate

The look of real wood at a lower price, with a hard top layer that stands up to kids and pets.

Scratch-resistant wear layer

LVP

Luxury vinyl plank. Waterproof and hard to scratch, the right call for kitchens, baths, basements and rentals.

100% waterproof

How it works

We take care of everything.

  1. 01

    Free estimate

    We come out, measure every room, and give you a written quote. No charge, no pressure.

  2. 02

    Demo and haul-away

    We tear out the old carpet or flooring and haul it off. You don't lift a thing.

  3. 03

    Install

    Subfloor leveled, material acclimated, then installed with clean cuts and tight seams.

  4. 04

    Cleanup and walkthrough

    We clean up, walk every room with you, and make it right if anything is off.

Our work

Before and after.

Jobs from around Kansas City. Keep scrolling and each room wipes from the day we showed up to the new floor going in.

Project 1 of 10 Or grab the gold bar and drag it yourself.
Before: Bedroom floor rebuilt, new hardwood
After: Bedroom floor rebuilt, new hardwood
BeforeAfter
Bedroom floor rebuilt, new hardwoodRotted boards out, joists and subfloor repaired, hardwood laid
Before: Staircase, plywood to new carpet
After: Staircase, plywood to new carpet
BeforeAfter
Staircase, plywood to new carpetTreads prepped and padded, carpet stretched over every step
Before: Deck and stairs rebuilt
After: Deck and stairs rebuilt
BeforeAfter
Deck and stairs rebuiltOld deck and stairs torn off, new deck, stairs and railing built
Before: Gray LVP, laundry and hall
After: Gray LVP, laundry and hall
BeforeAfter
Gray LVP, laundry and hallOld plank floor prepped, LVP clicked in through the doorway
Before: Sunroom, gray LVP
After: Sunroom, gray LVP
BeforeAfter
Sunroom, gray LVPSubfloor prepped, waterproof LVP in
Before: Same bedroom, the other side
After: Same bedroom, the other side
BeforeAfter
Same bedroom, the other sideFloor torn out to the joists, new hardwood run wall to wall
Before: Deck stairs, up close
After: Deck stairs, up close
BeforeAfter
Deck stairs, up closeNew stringers, treads and railing
Before: Stair landing, padded and carpeted
After: Stair landing, padded and carpeted
BeforeAfter
Stair landing, padded and carpetedPlywood steps off the hallway, carpet wrapped tight
Before: Bedroom, new carpet
After: Bedroom, new carpet
BeforeAfter
Bedroom, new carpetOld carpet pulled, new carpet stretched in wall to wall
Before: Kitchen after a stove fire
After: Kitchen after a stove fire
BeforeAfter
Kitchen after a stove fireSoot cleaned off, new cabinet doors and range hood, soffit skimmed and ready for paint

Start to finish

Every stage, every job.

Real jobs, photographed from the first day of demo to the final walkthrough.

Before: Bedroom, rebuilt from the joists1 · Before
During: Bedroom, rebuilt from the joists2 · During
After: Bedroom, rebuilt from the joists3 · After
Bedroom, rebuilt from the joistsRotted boards out, new subfloor and paper down, hardwood laid and ready for finish
Before: Laundry and hall, gray LVP1 · Before
During: Laundry and hall, gray LVP2 · During
After: Laundry and hall, gray LVP3 · After
Laundry and hall, gray LVPOld plank floor prepped, LVP clicked in through the doorway
Before: Sunroom, waterproof LVP1 · Before
During: Sunroom, waterproof LVP2 · During
After: Sunroom, waterproof LVP3 · After
Sunroom, waterproof LVPSubfloor prepped, LVP laid row by row, trim back on
Before: Staircase, plywood to carpet1 · Before
During: Staircase, plywood to carpet2 · During
After: Staircase, plywood to carpet3 · After
Staircase, plywood to carpetTreads cleaned and padded, then carpet stretched over every step

Walk it with David

Thirty seconds on three finished jobs.

Phone clips from the last day on site. No sound, they play as they come on screen.

New deck, up topPressure-treated boards and metal balusters
Carpeted stairs, top to bottomTreads and landing wrapped, hardwood at the top
Bedroom, new carpetThe finished room from the before and after above

Free estimates

New floors start with one call.

We work anywhere within 50 miles of Kansas City. Call or text David, or send a few details and we'll set up a time to measure.

Call or text(816) 203-6482
DVA installer holding a floor plank and a rubber mallet
Book now